Lincolns Inn Field

IMG_0244
IMG_0245
IMG_0248
IMG_0251
IMG_0252
IMG_0253
IMG_0244
IMG_0245
IMG_0248
IMG_0251
IMG_0252
IMG_0253

Project details

  • Gold Leaf: 23.5crt transfer leaf
  • 1hour size: Special paint used for gilding
  • Sign writers paint: Paint with lead content
  • Thorough clean up
    50%
  • Gild
    80%
  • Sign write
    85%

Sizing in coats of arms, railings and gates:

Works carried out for Hare and Humphreys

After a good rub down and clean up, we sized in the railing spear heads and gate detail. After that we gilded all the sized areas using 23.5 crt transfer gold leaf.

We set up our scaffold tower and then sign wrote in both of the coats of arms, finally gilding them where needed.

The whole job took a little longer than expected, but to us the finish is everything.

Leave a reply

Your email address will not be published. Required fields are marked *